Read two support dates correctly
The official Joomla schedule checked on 6 October 2026 lists 13 October 2026 as the end of regular bug-fix support for 5.x, and 12 October 2027 as the end of security-only support. These dates cover different support scopes. Saying “Joomla 5 support ended completely in October 2026” loses that distinction.
The schedule also notes that future release dates may change. Check the source again when planning work, record the check date and your site’s exact version. Support for the series and keeping the site current are different conditions. An installation left on an old patch does not automatically receive the security updates available during the 5.x support period.
Safety period is not a substitute for maintenance
Consider how regular bug-fix support differs from security-only support for your daily work. The core security schedule does not determine template and extension developers’ own support terms. List product versions, licenses and update status separately. Check developer support for required functions such as stores, forms and memberships.
PHP and the hosting environment should also be in the same list. What environment changes will your hosting provider make in the future? Do the products used support this? These questions cannot be answered by a single date of Joomla. Include backup, testing and monitoring in the maintenance plan. The decision to migrate before the end of the security period should be considered in conjunction with how much preparation the functions on the site require.
Separate three states for the current site
If required products work on a current 5.x installation, Joomla 6 preparation can start alongside regular maintenance. For an older 5.x installation, first assess update blockers within the existing series. Verify the latest working-site backup and test updates on a copy. Staying with the series does not mean doing nothing.
If there is a plugin that stops the major version change, create a separate decision record. Consider the manufacturer's target support, alternative product, and custom data transfer options. Instead of “We'll see later”, write down who will make the decision and with what information. A product that remains uncertain as the support date approaches may not be an issue that can only be resolved with a last-day update.
Treat Joomla 6 preparation as a compatibility task
The official 5→6 guide is initially based on the Joomla 5.4.x series. Achieving this condition is not the same as having all third-party products available. Inventory installed themes, components, modules and plugins. Verify target Joomla and PHP support for each with manufacturer documentation; Do not accept a line with missing information as approved.
Test login, content saving, forms, search and ordering where applicable. Add test scenarios for custom overrides and external service connections. Read the official guide on the compatibility plugins’ roles; don’t disable them arbitrarily on the live site. A successful rehearsal is the starting point for documenting the update sequence and required changes.
Set the transition date with your work calendar
Add official deadlines to your maintenance calendar; Set your own preparation goal at an earlier date. Define separate tasks for inventory, incompatible product decision, testing, and release. Let each task have a completion criterion: for example, the relevant form is sent and reaches the recipient, or the editor can save the article. Just writing the name of the target version is not a migration plan.
On launch day, check the final data transfer, new backup and rollback conditions. Plan separately how new orders or content would be handled during rollback. After migration, verify the maintenance routine in the new environment. Rechecking the schedule source and recording versions prevents reliance on an outdated plan.
Sources referenced
Check version and extension requirements in current official documentation before making changes.
If you're stuck here,
let’s continue together.
An older Joomla site’s template, extensions and custom code determine its migration path. I first take inventory, then plan the move to a supported target version on a test copy.
Get support for this task Check out the scope of service ↗